MTECK 1150E
Mounted on the Manta as a dredging crane, responsible for dredging the Fehmarnbelt tunnel trench
Completion | 2021 |
---|---|
Ship / Pontoon | Manta |
Type | Dredging Crane |
Particularies | Accurate positioning |
Boom length | 43 m |
Equipment | N/A |
Max load | Dredging 75 mT - Hoisting 150 mT |
---|---|
Hoist line pull | 75 mT |
Max hoist speed | 90 m/min |
Generator power | 2100 kVA |
Machine weight | 387 mT |
Trim | - |
Heel | - |